Debris reach and street closure

quakecascade.debris carries building damage onto the street network. It answers three questions in order: which buildings can drop debris on which roads, how likely each road is to receive debris, and, for one collapse realisation, which roads no longer let a vehicle through. Every distance is in metres. When a GeoDataFrame or GeoSeries carries a CRS it must be a projected metric CRS (crs.require_metric), and buildings, roads and debris must share it: inputs in different CRSs raise CRSError instead of being measured against each other. Plain Shapely arrays carry no CRS, so their unit is the caller's.

Reach: a bound without a coefficient

Debris cannot land farther from the footprint than the building is tall. With distance \(d\) from footprint to road centreline, carriageway width \(w\) and building height \(H\), building \(i\) reaches road \(r\) when

\[ c_{ir} = d_{ir} - \frac{w_r}{2} < H_i . \]

Without widths (\(w = 0\)) the distance is measured to the geometry itself (centreline, or a road polygon edge). reach_pairs runs one vectorised STRtree dwithin query and returns one row per pair with distance_m (to the centreline) and clearance_m (to the carriageway edge). A corner building appears once for each road it reaches, so pair counts are not building counts.

A building without a finite positive height is not dropped, because a road beside it would then read as free of debris. It is paired, with height_m NaN, with every road within unknown_height_reach_m, a reach you state as soon as one such building exists. There is no default taken from the data, because one implausible height in an inventory would then set the reach of every building without one. The bound is stored in pairs.attrs["unknown_height_reach_m"], and such buildings are counted in pairs.attrs["buildings_without_height"].

Debris pressure

For road \(r\) with reaching buildings \(B_r\) and complete-damage probabilities \(p_i\) (Hazus complete state):

\[ P_r = 1 - \prod_{i \in B_r} (1 - p_i), \qquad E_r = \sum_{i \in B_r} p_i, \qquad D_r = \frac{100\, E_r}{L_r}. \]

\(P_r\) (p_any_collapse) treats collapses as independent and every reaching collapse as landing on the carriageway, so it is an upper bound on the probability that debris reaches the road. It saturates on dense streets with many reaching buildings; \(D_r\) (expected_per_100m, expected collapses per 100 m of road) keeps a usable ranking for clearance priority. Neither is a closure forecast.

debris_status Meaning Values
computed every reaching building has a probability computed
partial some reaching buildings lack one, or a building of unknown height may also reach the road computed from the known ones: lower bounds of the full-information value
no_damage no reaching building has one NaN
no_height only buildings of unknown height may reach the road NaN
empty no building reaches the road 0, a true zero

A possible reacher of unknown height whose complete-damage probability is exactly 0 adds no uncertainty and is not counted; reaching_without_height counts the others.

Debris extent

Ported from the PlanX seismic engine with the arithmetic unchanged:

\[ r = k\, H\, f, \qquad V_s = A\, H\, \rho_s\, f, \qquad V_p = \frac{V_s}{1 - e}, \qquad M = \gamma\, V_s , \]

with footprint area \(A\) (m²) and released-material fraction \(f \in [0, 1]\). The radius scales linearly with \(f\), which over-states rather than under-states a pile in a screening model. The mass multiplies the solid volume, so \(\gamma\) is the density of the void-free material. A rubble bulk density, which already includes the voids, belongs with the pile volume (\(M = \gamma_{bulk} V_p\)); used as \(\gamma\) it understates the mass by the factor \(1 - e\). material_factor(states, factors) maps damage states to \(f\) from a table the caller supplies.

Parameter Symbol Unit Default Range and source
debris_factor / k \(k\) – required about 0.15–0.67: 0.15–0.5 falling with height, simulated envelope 0.57 (Wang et al., 2020); 1/2–2/3 of height in GB/T 51327 (as reported by Zheng et al., 2025)
solid_volume_ratio \(\rho_s\) – required no verified source (PlanX screening value 0.3)
void_ratio \(e\) – required no verified source; rubble piles are commonly described at 0.3–0.5
density_t_m3 \(\gamma\) t/m³ required density of the solid, void-free material; no verified source (PlanX screening value 1.8)
factors (material fraction per state) \(f\) – required no calibrated values; PlanX used the ordering 0 / 0 / 0.10 / 0.35 / 1.0
closed_share \(s^*\) – required no verified source; the IP3 screening study used 0.50
clear_width_m \(w_c\) m required local operational choice (vehicle width plus margin)
road class widths \(w\) m required mapping local design standards; no table ships with the package

Goretti and Sarli (2006) give a probabilistic road-blockage framework, not a \(k\)-times-height rule, and are not the source of \(k\).

Corridor blockage

debris_envelope grows each collapsed footprint by \(r_i\) (square caps, mitred joins with limit 2, as in the PlanX tool). corridor_blockage buffers each centreline by \(w_r/2\) (round caps) into a corridor \(C_r\) and measures

\[ s_r = \frac{\left| C_r \cap \bigcup_i D_i \right|}{|C_r|}, \qquad \text{closed}_r = s_r \ge s^* . \]

Overlapping piles are unioned per road, so shared ground is counted once. A road with zero width has no corridor: blockage_status = "no_width" and a NaN share. A collapsed building without a usable height has no pile of known size. unknown_height_envelope grows its footprint by \(k\,H_u\,f\), with \(H_u\) the same unknown_height_reach_m bound. Areas passed as uncertain (for example the envelopes of buildings whose damage state could not be computed) count the same way. A corridor such debris touches reads partial when known debris already covers part of it (the share is a lower bound, and closed reflects the known debris only). When no known debris covers it, the share is NaN, with no_height or no_damage, as in debris_pressure.

A blocked share does not say whether a vehicle still passes. navigable_core applies a morphological opening: erode the open corridor by \(w_c/2\) and regrow it by the same amount, so every part narrower than \(w_c\) disappears, including the thin sliver left beside a pile. The opening runs at \(w_c/2\) minus a 1 mm geometric tolerance (width_tolerance_m), so that a space exactly as wide as the vehicle does not collapse to a line. navigable_roads does this per road on \(C_r \setminus \bigcup_i D_i\) and marks a road passable when one connected part of the core touches both centreline end points. With round-capped corridors an undisturbed road is passable exactly when \(w_r \ge w_c\). Narrower roads get navigable_status = "narrower_than_clear_width" (zero-width ones no_width), so a closure that the debris did not cause is visible as such. A road touched by the uncertain areas (debris of unknown extent) reads partial, and its passable is then an upper bound.

closed_road_ids(frame) returns the road_id of roads closed by debris: closed in a blockage frame, or not passable with status computed or partial in a navigable frame. impassable_road_ids(frame) returns the roads a vehicle of width \(w_c\) could not use even before the event. A before/after comparison has to drop those from both networks, as cascade.run does; otherwise they would count as event closures. Ids are the caller's id column or array, else the row order, and are meant for RoadNetwork.without(edge_ids).

Applicability

  • The reach bound is physical; the spread factor \(k\) that sharpens it is not calibrated for any building stock. Run the closure steps for a bracket of \(k\) values.
  • Per-road corridors ignore junction geometry; a pile at a junction counts on each road it covers.
  • Closure is evaluated for one collapse realisation. Repeat over sampled realisations (e.g. from correlated damage samples) for closure frequencies.

Example

import numpy as np
from shapely.geometry import LineString, box
from quakecascade import debris

buildings = [box(0, 8, 10, 18), box(0, 12, 10, 22), box(40, 6, 50, 16)]
heights = np.array([10.0, 10.0, 10.0])
roads = [LineString([(-50, 0), (100, 0)])]

pairs = debris.reach_pairs(buildings, heights, roads)          # buildings 0 and 2 reach
pressure = debris.debris_pressure([0.2, 0.1, 0.5], pairs, road_length_m=[150.0])
print(pressure[["p_any_collapse", "expected_per_100m", "debris_status"]])
# p_any_collapse = 1 - 0.8 * 0.5 = 0.6

collapsed = np.array([False, False, True])
blockage = debris.corridor_blockage(buildings, roads, collapsed, heights_m=heights, k=0.5,
                                    closed_share=0.5, road_widths_m=10.0)
piles = debris.debris_envelope(buildings, collapsed, heights, k=0.5)
passable = debris.navigable_roads(roads, piles, road_widths_m=10.0, clear_width_m=3.0)
print(blockage[["blocked_share", "closed"]], passable[["passable"]])
print(debris.closed_road_ids(passable))   # [] : 6 m stays clear beside the pile

References

  • FEMA (2024). Hazus Earthquake Model Technical Manual, Hazus 6.1. Federal Emergency Management Agency, Washington, DC.
  • Goretti, A., & Sarli, V. (2006). Road network and damaged buildings in urban areas: short and long-term interaction. Bulletin of Earthquake Engineering, 4(2), 159–175. doi:10.1007/s10518-006-9004-3
  • Wang, W., Zhang, N., Wang, L., Wang, Z., & Ma, D. (2020). A study of influence distance and road safety avoidance distance from postearthquake building debris accumulation. Advances in Civil Engineering, 2020, 7034517. doi:10.1155/2020/7034517
  • Zheng, X., Hou, Y., Cheng, J., Xu, S., & Wang, W. (2025). Rapid damage assessment and Bayesian-based debris prediction for building clusters against earthquakes. Buildings, 15(9),
  • doi:10.3390/buildings15091481